Informal timeline for my project:
- S, 11/9: Research data points to match with Peter Pan plot points and create a storyboard
- M, 11/10: Mock-up, Storyboard, and/or Outline due.
- W, 11/12: Begin playing with Flash to see how accessible of a tool it will really be, watch tutorials
- M, 11/17: Presentation Sign-up., Continue working with flash/InDesign and finding visuals to incorporate
- T, 11/18: Draft of work set up in Flash
- W, 11/19: Rough Cut for Peer Feedback; Project 3 Revision Plan.
- F, 11/21: Selfie showing yourself at work – most work needs
- Thanksgiving Break: Do the bulk of work in Flash, use this time to perfect it
- W, F, M, W, 12/3–12/10: In-class Presentations.
- W, 12/10: Finalize any mishaps that might have occurred in the Presentation
- W, 12/10: Project Due by 11:55 PM.
So far, I’ve started finding research data about the job market and college graduates in order to narrow down which facts I want to include. It’s been an interesting and informative search so far! I just need to look more in-depth at the plot and try to match parts with facts to make it interesting. Something I have not started yet that I think could be difficult is finding the visuals to use in the video. What I’m picturing is something like this: https://www.youtube.com/watch?v=zx2o2huVm2o but with peter pan visuals and different information. I just want it to be that style, but a little bit shorter.